Join Alliance Technical Group and Trinity Consultants for a complimentary webinar, “How to Prepare for Proposed Control Device Testing and other Regulation 7 Changes”. As they currently stand, the proposed revisions include new requirements for the upstream and midstream segments including (but not limited to) required flowmeters for Reg 7 Part D Section II.B. control devices, performance testing for ECDs, and capture/control requirements for midstream pigging and blowdowns. Join us on November 8 for a free webinar covering these proposed changes and how they may impact your facility.
08 Nov 2021 12:00 PM - 1:30 PM CT
Course Topics
Alliance Technical Group
Combustion Stack Testing
Planning and Preparing for Test
Test Methods
Trinity Consultants
Proposed Regulation 7 Changes Impacting O&G
Control Device Inspections
ECD Testing
Other Updates